Free commercial lighting assessment in New Jersey

Start with a review of the lighting in your commercial building. Sunshine Lighting Group helps New Jersey businesses evaluate LED upgrades and review eligibility for available utility incentives.

Request your free lighting assessment or call 833-718-0099.

What the assessment helps you review

  • The existing fixtures and how long the lights operate.
  • Areas with uneven lighting or recurring maintenance needs.
  • Potential LED fixture upgrades and lighting controls.
  • Utility program eligibility and the proposed project scope.
  • Access requirements and installation scheduling.

What to have ready

Use the assessment request form to share your name, company, email, phone number and ZIP code. During follow-up, be ready to discuss your property address, utility provider and the type of lighting currently installed. Fixture counts or photographs can help with the initial review.

Commercial lighting assessment checklist

You do not need a complete fixture schedule before contacting us. Start with the information you already have and note anything that needs to be checked during the walkthrough. For larger properties, organize the details by building or work area.

  • Space and layout: Share the approximate floor area and ceiling or fixture mounting heights, when known. Include aisles, racking, loading areas, mezzanines, offices and shared spaces that use different lighting.
  • Existing fixtures: Describe the fixture types and approximate quantities in each area. Photos taken from an accessible position can help show the layout and visible labels. Unknown equipment details can be reviewed on site.
  • Operating pattern: Explain the normal shifts, when lights are switched on and which areas are occupied continuously or intermittently. Mention daylight, existing sensors and any zones that need separate controls.
  • Utility information: Be ready to identify the electric utility and the account associated with the property. Mention previous lighting upgrades or incentive applications so the project history can be reviewed.
  • Approval contacts: Identify who manages the property, pays the utility bill and can approve the proposed work. If you lease the space, explain which lighting and common areas are under your control.
  • Site access: Describe busy periods, restricted areas, loading activity and any limits on access to the fixtures. This helps the team discuss a walkthrough and installation schedule that fits your operations.

Prepare for the way your building is used

For a warehouse lighting assessment, identify the aisles, loading zones and workstations that need attention. Tall racking and changing storage layouts are useful details to discuss when reviewing fixture placement.

For manufacturing facilities, separate production floors, assembly areas and offices in your notes. Explain the work performed in each area and any access restrictions around operating equipment.

For managed properties, keep a separate list for each building, utility account and site contact. Note which areas belong to tenants and which are shared so approval responsibilities can be clarified.

Documents to discuss during follow-up

Have a recent electric bill available so the service address, utility provider and account can be reviewed. If the space is leased, identify the account holder and the person authorized to approve work in tenant and shared areas. Note any previous lighting incentive applications. Ask which documents are needed for the proposed program and how to provide them; the initial request form does not require a bill upload.

Questions to discuss before approving an upgrade

  • Which fixtures and areas are included in the proposed scope?
  • What lighting controls are proposed, and how will they be used?
  • Which utility requirements and project approvals still need to be reviewed?
  • What is the project cost, and is there any customer contribution?
  • How will installation access and scheduling be handled?

Our commercial lighting project gallery shows real lighting photos supplied by our team. Use these as visual references when discussing your space; the equipment and layout for your property depend on its own assessment.

How utility incentives affect the project

For a comparison of PSE&G, JCP&L and Atlantic City Electric program routes, read our New Jersey commercial LED lighting incentive guide.

Incentives depend on the utility, current program requirements, existing equipment and proposed upgrades. A no-cost installation is available only when the project qualifies. The assessment helps determine the next steps; it does not guarantee funding or a particular level of savings.

Read about the no-cost LED lighting program or learn about the project review process.

Send your assessment request

Open the assessment request form. For questions about your property, call 833-718-0099.